Ministry of National Defense Officer’s Dormitory Building Construction – ISKENDERUN
Slag Casting Facility and 1. & 2. Slab Stock Yard Projects Construction Installation Works – ISDEMİR
Scrap Preparation and Storage Area and Scal Breaking Building
Mustafa Kemal University Research & Development Hospital Building Construction – HATAY
Mustafa Kemal University Campus Infrastructure Works – HATAY
Mustafa Kemal University Science & Letters Faculty Building Construction –HATAY
Mustafa Kemal University Medicine Faculty Education Building Construction – HATAY
Dörtyol EKINOBA Residence Construction – HATAY
Denizciler EKINOBA Residence and Shopping Centres
Concrete Plant -HATAY
Ministry of National Defense Officer’s Dormitory Building Construction - HATAY

- Total Construction Area : 7.000 m2
- Bedrooms               :  85 rooms (regular, family, suit, handicapped)
- Cafeteria
- Restaurant
- Kitchen
- Wedding Hall
- All infrastructure and environmental organizing works.
- Library

Slag Casting Facility and 1. & 2. Slab Stock Yard Projects Construction Installation Works -ISDEMIR


A- Number 1 & 2 SLAB STOCK YARDS
  -Excavation Amount : 120.000 m3
  -Filling Amoun : 92.500 m3
  -Concrete Amount : 15.000 m3
  -Steel Amount   : 1.200 ton
  -Steel Construction (inclues installation) : 135 ton
  -Railways  : 2.000 m

B- SLAG CASTING FACILITY
   
  -Excavation Amount : 11.000 m3
  -Filling Amount . 13.000 m3
  -Concrete Amount : 15.000 m3
  -Steel Amount : 1.300 m3
  -Steel Construction (inclues installation) : 2.800 ton
  -Foraj : 4.000 m
  -Railways : 1.000 m

                                                           

 
 
 
 
 
 
 
 
 
     
SCRAP PREPARATION AND STORAGE AREA AND SCAL BREAKING BUILDING

PRODUCTION VOLUME      
Excavation Works : 30.250

m3

Stabilized Filling Works

:

15.600

m3

Ferrous and Non-ferrous Concrete          : 21.000 m3

Mould production

:

15.500

m2

Thin and Thick Rebar : 1.950

ton

Steel Constructions + Installation + Paint

: 2.250 ton
Anchorage + Embedded Element      

Production and Installation

:

85

ton

Plant-painted Galvanized Steel Plates      

Supply and Installation

: 18.000 m2
Railway

:

1200 mt
         
MECHANICAL WORKS

Technologic Equipment Installation & Dismantling Works

: 350

ton

Pipes and Related Equipment Production

:

   
Installation Works                5.450 m
       
ELECTRIC WORKS

 

 

 

Installation works for transformers at various powers

:

                  2Adet

Laying down various low voltage power cables

:

7.030 m

Laying down medium voltage power cables and special cables

: 9.800 m


SCRAP PREPARATION PLANT

  • Dimensions:
  •     - Length: 276 m
        - Breadth:    35 m
        - Height: 15 m  (height above the rail)
  • The plant will be entirely covered while sides will be covered up to the rail level. The part from the rail to the ground will be left open for the access of vehicles transporting scraps.
  • There will be scrap pools with a depth of 3.5 meters in the plant.
  • There will be 4 overhead trolley cranes with 20MT capacity and 3 Monorail cranes with a capacity of 3-5MT
  • A railway will be laid down in the plant in order to carry scraps in wagons.
  • Shift

  • SCAL BREAKING BUILDING

  • Unit’s dimensions:
        -Length : 90m
        - Breadth :  30 m
  • There will be one 15MT modified ceiling crane installed at the height of +22.000. One scal carriage crane with a capacity of 80/20 MT shall be installed at a height of + 15.000.
  • Heavy scrap cutting machine will be used. Control room and transformer station will be built.
  • Mustafa Kemal University Research & Development Hospital Building Construction – HATAY


    - Total Construction Area : 40.000 m2 
    - Bed Capacity :   400 
    - Policlinics
    - Administration Offices

     

    Mustafa Kemal University Campus Infrastructure Works – HATAY

    - P- Landscape Areas
    - Electrical Infrastructure System
    - Installation Infrastructure System
    - Various Roads
    - Social Fields

    • Mustafa Kemal University Science & Letters Faculty Building Construction –HATAY

    - Total Construction Area : 17.000 m2
    - Classrooms
    - Laboratories
    - Rostrum Blocks

    • Mustafa Kemal University Medicine Faculty Education Building Construction – HATAY

    - Total Construction Area : 20.000 m2
    - Classrooms
    - Laboratories
    - Rostrum Blocks

    • Dörtyol EKINOBA Residence Construction – HATAY


    The Ekinoba Residence consists of 3 blocks. With 10 apartments in each block, the Residence offers 30 apartments. Gross surface area of each apartment is 161 m2, with net living area of 137 m2. Each apartment has 1 living room, 1 bedroom , 2 kid rooms,  kitchen,  1 parents bathroom, 1 family bathroom, 1 family toilet and  1 large sunken balcony. Furthermore overall landscape works were completed by  EKINTAŞ AS.

    As it is shown in the attached photography , a fully-equipped model apartment is now ready and available for our clients to come and see.

    • DENIZCILER EKINOBA RESIDENCE AND SHOPPING CENTRES

    Denizciler Ekinoba Residence and Shopping Centers are composed of 2 blocks. Each block has regular apartments, duplex and roof duplex flats; in addition, there are socialization areas, shopping centers, stores, markets, fast food courts, theaters and car parking spaces for making life easier and more convenient.

    Landscaping works for Denizciler Ekinoba Residence and Shopping Centres will be made by us. The greenery you will view from your balcony while you sip your tea will make you feel calmer and peaceful.

    Number of houses:

    • 28 regular apartments
    • 6 duplex apartments
    • 2 roof duplex apartments
     

    • Concrete Plant –HATAY

    -The plant’s annual production capacity is 180.000 m3.
    -Thanks to the production meeting TSE standards and ISO 9001-2000 Quality System requirements, the plant meets the demand for ready-mixed concrete in Iskenderun, Arsuz, Payas, Dörtyol and Belen.


     
      Holding Homepage | Iron & Steel | Shipping | Marine | Investment and Securities | Agriculture | Energy